Contact Us

Mechanical Installation for Scheuch GMBH

scheuch gmbh mechanical installation 1

This project was a full installation of an 800T bag filter and heat exchanger.

Our client designed the equipment and had it fabricated overseas. It was then shipped into the UK for TFL Responsive Engineering’s own site team to assemble, weld and install.

The project included all structural steelwork, filter casings, ducting, pipe work, conveyors and commissioning assistance. It took 5 months to complete with over 20,000 person-hours being worked incident and accident free.

The final connection into the end user’s plant was undertaken during their strict 20 day shut down and required 24 hour working to meet the deadline and avoid production delays.


Client
Scheuch GMBH
Location
Hanson Cement, Ketton
Service
Mechanical Installation
Duration
5 months
Completion
February 2021
View More Projects
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram